Replacement of approximatiely 15,000 SF of existing deteriorated roof membrane system in conjunction with the reconstruction of the balcony dividing walls and electrical upgrades. The elimination of ponding water at specific locations was vital and was corrected using Sikalastic 720 Base (Sloping) prior to the application of the Sikalastic RoofPro System. Performing this work while maintaining the watertight integrity of the roof was of paramount importance due to the space below being occupied at all times. This was accomplished by careful planning and execution of the multi-component RoofPro System.